[1]
N.Jreou, G. 2012. Increasing of Oil Field Productivity by Implementation of Re-entry Horizontal Injection Well, Case study. Iraqi Journal of Chemical and Petroleum Engineering. 13, 3 (Sep. 2012), 17–34. DOI:https://doi.org/10.31699/IJCPE.2012.3.3.