[1]
Mohammed, K.A. and A. Al-Haleem, A. 2020. Optimization of Hole Cleaning and Cuttings Removal in High Inclined Till Horizontal Well. Iraqi Journal of Chemical and Petroleum Engineering. 21, 1 (Mar. 2020), 61–66. DOI:https://doi.org/10.31699/IJCPE.2020.1.9.