[1]
K. A. Mohammed and A. A. Al-Haleem, “Optimization of Hole Cleaning and Cuttings Removal in High Inclined Till Horizontal Well”, IJCPE, vol. 21, no. 1, pp. 61–66, Mar. 2020, doi: 10.31699/IJCPE.2020.1.9.