Development of East Baghdad Oil Field By Clusters of Horizontal Wells

Authors

  • Ayad A.Alhaleem A.Alrazzaq Petroleum Engineering Department, College of Engineering, University of Baghdad, Baghdad, Iraq

DOI:

https://doi.org/10.31699/IJCPE.2019.3.10

Keywords:

Horizontal wells, Productivity, Vertical permeability, Reentry drilling wells

Abstract

There are varieties of reasons lead for drilling horizontal wells rather than verticals. Increasing the recovery of oil, especially from thin or tight reservoir permeability is the most important parameter.

East Baghdad oil field considered as a giant field with approximately more than 1billion barrel of a proved reserves accompanying recently to low production rate problems in many of the existing wells.

   It is important to say that presence of of  horizontal wells in East Baghdad field especially by converting some of already drilled wells by re-entry drilling horizontal sections may provide one of best solutions for the primary development stage in East Baghdad field which may be followed by drilling new horizontal wells or using multilateral wells.

   Advance software (Well Test/FAST) has been used to convert the production data for the already drilled vertical wells to horizontals to simulate the productivity. It can be concluded that no measurements available for the ratio of anisotropy (Kv/Kh); in East Baghdad Oil Field therefore, the wells productivity has been estimated using wide range of anisotropy ratios that will help the field operator to determine exactly wells productivity. Moreover, it helps to recommend the effectiveness of applying hydraulic fracturing in improving horizontal well productivity.

   The results show that it could be used well EB-32 as a re-entry horizontal well with an optimum section length of 1500-2000ft wich give the best production rate. The same result could be stated for EB-10 with somewhat higher productivity than EB-32.

References

Hasan Ali N. ,Ayad A.Alhaleem,"Torgue and Drag Forces Problems in Highly Deviated Oil Well", Iraqi Journal of Chemical and Petroleum Engineering,Vol.19,No.3,p.p.19-31,Septemper 2018.

Mohammed S.AL.J,A.A.AL-Dabaj and Hassan A.Hadi,"Design of Horizontal Well Program for Ajeel Field", Iraqi Journal of Chemical and Petroleum Engineering,Vol.15,No.1,p.p.59-63,March 2014.

Ghanim M.F.,Maha R.Abdulamir," Formulation of New Equation to Estimate Productivity Index of Horizontal Wells", Iraqi Journal of Chemical and Petroleum Engineering,Vol.15,No.2,p.p.61-73,June 2014.

Jalal Abdulwahid Al-Sudani," Analytical Model for Detection the Tilt in Originally Oil Water Contacts", Iraqi Journal of Chemical and Petroleum Engineering,Vol.15,No.3,p.p.51-60,September 2014

Mid Field Oil Company "Final Well Reports", Iraq, 2005.

Mid Field Oil Company "Final Well Reports", Iraq, 1999.

M.S. Al-Blehed et.al. “Horizontal wells Find Varied Applications in Saudi Fields”, Oil and Gas Journal,May-2000.

Abdullah M. Al-Qahtani, and Habib Menouar" New Correlations for Optimizing Horizontal Wells Completions",SPE37768-1997.

Michael J. Economides,” Completion Technology for Unconsolidated Formation”, Rev.2-1995.

Joshi, S. D., "Horizontal Well Technology", Penn. Well Publishing Company, Tulsa, OK, USA, 1991.

Fekete Associates “Advance Software Technology”,Version-2009.

Downloads

Published

2019-09-30

How to Cite

A.Alrazzaq, A. A. (2019). Development of East Baghdad Oil Field By Clusters of Horizontal Wells. Iraqi Journal of Chemical and Petroleum Engineering, 20(3), 75-79. https://doi.org/10.31699/IJCPE.2019.3.10

Publication Dates