Torque and Drag Analysis for Horizontal Extended Reach Coiled Tubing Drilling

Authors

  • Mustafa M. Alezzi Drilling Department, Field Devision North Oil Company, Ministry of Oil, Kirkuk, Iraq
  • Ali Khader Materials and corrosion, Aeronautical/ Mechanical Engineering Department School of computing, Science and Engineering, University of Salford Manchester, UK
  • Aiham S. Kader Drilling Department, Field Devision North Oil Company, Ministry of Oil, Kirkuk, Iraq

DOI:

https://doi.org/10.31699/IJCPE.2024.2.5

Keywords:

Coiled Tubing Drilling; Torque, Drag; Horizontal wells; Extended each

Abstract

One of the major elements faced in downhole drilling operations of oil and gas wells is the limited reach of coiled tubing (CT) in horizontal wellbores. To address this issue, this work creates an extended reach limit simulation of CT with starting bending curvature in a horizontal wellbore for an Iraqi well in the Ahdeb oil field. Using Drillbench software, a calculation approach is provided based on contact force and buckling models to determine the extended reach limit of CT. The findings of this study have significant implications for improving downhole drilling engineering design parameters and predicting the extended reach limit of CT. By considering factors such as friction resistance and contact force between the wellbore, a more accurate assessment of the CT’s abilities can be suggested based on well trajectory curvature and well devotion. To achieve this, a slim open hole with a diameter of 6 inches was drilled to a measured depth ranging from 3755 to 3986.5 m. The results showed that a consistent trend in azimuth and inclination in the completed section, with the hook load increasing by about 25 tons during pickup and decreasing by 11.4 tons during slack-off along the curved section due to friction effect. Additionally, elongation and relative stress showed slight increase during pickup in curved areas due to friction and temperature effect, while values decreased during slack-off due to drag action. Pressure loss in the curved section was found to be lower compared to the vertical section, primarily due to the bit nozzle discharge effect. Eventually, the friction coefficient values remained within acceptable industry limits. Ultimately, the study determined limited extended lengths for CT in this horizontal well.

References

G. a. G. M. Garfield, “"Latest Developments and New Technology for Coiled-Tubing Sidetracking Applications.",” in IADC/SPE Drilling Conference, Orlando, Florida, USA, 2008. https://doi.org/10.2118/112587-MS

W. H. L. G. Shen Zhonghou*, “Feasibility analysis of coiled tubing drilling with supercritical carbon dioxide,” Petroleum Exploration and Development, vol. 37, no. 6, pp. 743-747, 2010. https://doi.org/10.1016/S1876-3804(11)60008-6

F. Guan, "An Experimental Study of Flow Behavior of Coiled Tubing Drilling System," Advances in Mechanical Engineering, pp. 1-9, 2014. https://doi.org/10.1155/2014/935159

E. Eide, "Further Advances in Coiled-Tubing Drilling," Journal of Petroleum Technology, vol. 47, no. 5, pp. 403-408, 1995. https://doi.org/10.2118/28866-PA

J. L. Q. Z. H. e. a. Zhao, “Nonlinear Dynamic Model and Characterization of Coiled Tubing Drilling System Based on Drilling Robot,” Journal of Vibration Engineering & Technologies, vol. 9, p. 541–561, 2021. https://doi.org/10.1007/s42417-020-00246-x

S. Miska, W. Qiu, L. Volk, and J. Cunha, “An Improved Analysis of Axial Force Along Coiled Tubing in Inclined/Horizontal Wellbores,” in International Conference on Horizontal Well Technology, Calgary, Alberta, Canada, 1996. https://doi.org/10.2118/37056-MS

K.-I. Sola, “New Downhole Tool for Coiled Tubing Extended Reach,” SPE, Houston, 2000. https://doi.org/10.2118/60701-MS

J. wu, “Coiled Tubing Buckling Implication in Drilling and Completing Horizontal Wells,” SPE paper, pp. 16-21, 1995. https://doi.org/10.2118/26336-PA

J. Abdo, “Effects of tribological properties of water-based drilling fluids on buckling and lock-up length of coiled tubing in drilling operations,” Tribology International, vol. 82, pp. 493-503, 2015. https://doi.org/10.1016/j.triboint.2014.01.028

Y. Qianbei, “The Posting-Buckling Analysis and Evaluations of limit drilling length for Coiled Tubing in the Sidetrack Horizontal Well,” Journal of Petroleum Science and Engineering, no. 164, p. 559–570, 2018. https://doi.org/10.1016/j.petrol.2018.01.061

Z. Liang, “Critical Helical Buckling Load Assessment of Coiled Tubing under Axial Force by use of the Explicit Finite-Element method,” Journal of Petroleum Science and Engineering, no. 169, pp. 51-57, 2018. https://doi.org/10.1016/j.petrol.2018.05.053

J. Zhang, “The Helical Buckling and Extended Reach limit of Coiled Tubing with initial bending curvature in Horizontal wellbores,” Journal of Petroleum Science and Engineering, no. 200, pp. 1-10, 2021. https://doi.org/10.1016/j.petrol.2021.108398

B. Guo, J. Li, and Y. Feng, “How Much Can You Extend the Reach of Coiled Tubing in Horizontal Wells Using Pressure-Hammer/Pulsing Tools,” in SPE Unconventional Resources Conference-USA, The Woodlands, Texas, USA, 2013. https://doi.org/10.2118/164527-MS

Y. Hu, “Coiled Tubing Friction Reduction of Plug milling in long Horizontal well with Vibratory tool,” Journal of Petroleum Science and Engineering, vol. 177, pp. 452-465, 2019. https://doi.org/10.1016/j.petrol.2019.02.042

X. He, G. W. Halsey, and A. Kyilingstad, “Interactions between Torque and Helical Buckling in Drilling,” in SPE Annual Technical Conference and Exhibition, Dallas, Texas, 1995. https://doi.org/10.2118/30521-MS

X. He and A. Kyllingstad, “Helical Buckling and Lock-Up Conditions for Coiled Tubing in Curved Wells,” SPE Drilling and Completion, vol. 10, pp. 10-15, 1995. https://doi.org/10.2118/25370-PA

A. Sanchez, G. R. Samuel, and P. Johnson, “An Approach for the Selection and Design of Slim Downhole Motors for Coiled Tubing Drilling,” in International Conference on Horizontal Well Technology, Calgary, Alberta, Canada, 1996. https://doi.org/10.2118/37054-MS

A. E. C. NOV CTES, Coiled Tubing Manual, Texas, U.S.A: NOV CTES, 2013.

Schlumberger, “Drillbench Dynamic Drilling Simulation Software,” Schlumberger.

D. Manuals, “Drilling Manuals,” 30 01 2017.

D. Manual, “Drilling Manual,” A Japanese venture company.

Downloads

Published

2024-06-30

How to Cite

Alezzi, M. M., Khader, A., & Kader, A. S. (2024). Torque and Drag Analysis for Horizontal Extended Reach Coiled Tubing Drilling. Iraqi Journal of Chemical and Petroleum Engineering, 25(2), 49-59. https://doi.org/10.31699/IJCPE.2024.2.5

Publication Dates

Received

2023-09-18

Revised

2024-04-06

Accepted

2024-04-06

Published Online First

2024-06-30